Giải pháp
100 giải pháp sẵn sàng triển khai trong mười lĩnh vực, mỗi giải pháp gồm bài toán, lộ trình giao thức, dòng sản phẩm đề xuất và danh sách kiểm tra cho quản lý dự án.
10 giải pháp
07Transportation & Infrastructure
S61–S70S61
Metro Station BMS Integration
Station ventilation, lighting, lifts, escalators and pumps come from different packages, and the station control room has no single view during peak hours or incidents.
Tìm hiểu thêm →S62
Railway Facility Monitoring
Trackside equipment rooms, substations and station buildings along the line are unmanned, and their power, cooling and intrusion alarms reach maintenance crews late.
Tìm hiểu thêm →S63
Airport Facility Management
Terminal HVAC, lighting, boarding bridges, baggage systems and energy meters are run by separate contractors, so facility managers cannot see service impacts or energy per terminal area.
Tìm hiểu thêm →S64
Tunnel Ventilation Monitoring
Jet fans and CO / visibility sensors are controlled by a local PLC, but the traffic control centre does not see fan status, sensor trends or faults in time.
Tìm hiểu thêm →S65
Tunnel Lighting Monitoring
Tunnel entrance lighting runs at full stages regardless of outside luminance, wasting energy, and failed circuits are found only on night inspections.
Tìm hiểu thêm →S66
Bridge Environmental Monitoring
Wind, temperature and humidity on long bridges affect traffic restrictions and maintenance, but readings are collected from standalone loggers weeks later.
Tìm hiểu thêm →S67
Highway Facility Monitoring
Roadside cabinets for signs, lighting, pumps and toll equipment are spread over hundreds of kilometres, and power or door alarms are only found on patrol.
Tìm hiểu thêm →S68
Port Equipment Monitoring
Cranes, reefer points and shore power are controlled by PLCs from several suppliers, so the terminal cannot compare equipment availability or energy use across the quay.
Tìm hiểu thêm →S69
EV Bus Charging Infrastructure
Depot chargers, transformers and building loads share one grid connection, and without live data the depot risks peak charges or buses not charged by morning.
Tìm hiểu thêm →S70
Transportation IoT Edge Gateway
Stations, tunnels and roadside sites each need a small, rugged data point that speaks field protocols and reports securely to the central platform without a new RTU design per site.
Tìm hiểu thêm →