Çözümler
On alanda uygulamaya hazır 100 çözüm; her biri sorunu, protokol yolunu, önerilen ürün serisini ve proje yöneticisi için bir kontrol listesini içerir.
10 çözüm
04Industrial & Manufacturing
S31–S40S31
PLC Multi-Protocol Gateway
Siemens, Schneider, Mitsubishi and Rockwell PLCs on the same site cannot exchange data without extra programming in each controller, and every interlock between lines becomes a project.
Daha fazla bilgi →S32
Modbus to OPC UA Gateway
The MES and historian expect OPC UA, but meters, drives and small controllers only offer Modbus registers without names, units or scaling.
Daha fazla bilgi →S33
PLC to MQTT Gateway
Headquarters wants production data from every plant in the cloud, but opening PLC networks to the internet is not acceptable to the plant’s IT and safety teams.
Daha fazla bilgi →S34
Legacy Equipment Connectivity
Machines and instruments with RS-232 or RS-485 ports still run well but are invisible to modern systems, and replacing them only for connectivity is hard to justify.
Daha fazla bilgi →S35
Factory Equipment Monitoring
Supervisors learn that a machine has stopped by walking the floor, and stoppage causes are written on paper at the end of the shift.
Daha fazla bilgi →S36
OEE Data Acquisition
OEE is calculated from manual logs, so availability, performance and quality figures are disputed and improvement projects start from guesswork.
Daha fazla bilgi →S37
Predictive Maintenance Data Gateway
Maintenance wants vibration, temperature and current trends to plan work, but the data sits in drives and sensors that nobody logs, so failures still arrive as surprises.
Daha fazla bilgi →S38
Compressed Air Monitoring
Compressors run on local pressure switches, leaks and idle running go unnoticed, and nobody knows the energy cost of a cubic metre of compressed air.
Daha fazla bilgi →S39
Boiler & Steam Monitoring
Boiler efficiency, steam flow and condensate return are recorded by hand in the boiler house, so fuel waste and steam losses stay hidden between inspections.
Daha fazla bilgi →S40
Factory Energy Management
Energy is the largest variable cost after materials, but it is only known per month from the utility bill, never per line, shift or product.
Daha fazla bilgi →