MILESGO
Teklif İsteyin

Industrial & ManufacturingS39

Boiler & Steam Monitoring

Sorun

Boiler efficiency, steam flow and condensate return are recorded by hand in the boiler house, so fuel waste and steam losses stay hidden between inspections.

Çözüme genel bakış

MILESGO gateways collect data from boiler and burner controllers, steam flow meters, gas meters, pressure transmitters, PT100 / PT1000 temperature probes over Modbus RTU / Modbus TCP / HART, and deliver it to SCADA, the energy management system, SMS, email and messaging alarms as OPC UA / MQTT / BACnet/IP. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • boiler and burner controllers
  • steam flow meters
  • gas meters
  • pressure transmitters
  • PT100 / PT1000 temperature probes

Protocol path

Modbus RTU / Modbus TCP / HART → OPC UA / MQTT / BACnet/IP

Implementation checklist for the project manager

  • Fire and life-safety systems are monitored read-only; control stays with the certified fire system.
  • Commission in read-only mode first; enable write / control points only after the client approves each one.
  • Collect register maps and protocol documents from every equipment vendor early; a missing map is the most common delay.
  • HART instruments are read through the HART converter; list device addresses and variables for each loop.
  • For hard-wired signals, list each DI/DO/AI/AO with its type (dry contact, 4–20 mA, 0–10 V, PT1000) and choose I/O modules accordingly.
  • Define an alarm matrix (priority, recipient, escalation) and test every alarm end to end at SAT.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

Sistem mimarisi

Field layer: boiler and burner controllers, steam flow meters, gas meters, pressure transmitters, PT100 / PT1000 temperature probes, connected over Modbus RTU / Modbus TCP / HART. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: SCADA, the energy management system, SMS, email and messaging alarms, which receives the data as OPC UA / MQTT / BACnet/IP. Remote access for maintenance runs over VPN rather than open internet ports.

Sistem bileşenleri

Field devices
boiler and burner controllers, steam flow meters, gas meters, pressure transmitters, PT100 / PT1000 temperature probes
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
SCADA, the energy management system, SMS, email and messaging alarms (OPC UA / MQTT / BACnet/IP)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

Yazılım ve yapay zekâ yetenekleri

  • Consumption baseline and deviation alertsYol haritasında
  • Anomaly detection on trend dataYol haritasında

Teslimat adımları

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

Müşteriye sağlanan değer

  • Consumption visible by area, system and time period
  • Abnormal conditions seen early, before they become failures
  • Reliable trend data for optimisation and fault diagnosis
  • Monitoring added without changing existing control programs

Industrial & Manufacturing alanındaki diğer çözümler

Projenizi bize anlatın

Protokolleri, nokta sayısını ve hedef sistemi gönderin. Satış ve mühendislik ekibi her başvuruyu birlikte inceler.

Projenizi Görüşelim