Airport Facility Management

ปัญหา

Terminal HVAC, lighting, boarding bridges, baggage systems and energy meters are run by separate contractors, so facility managers cannot see service impacts or energy per terminal area.

ภาพรวมโซลูชัน

MILESGO gateways collect data from air handling units (AHU), chillers, lighting control panels, PLCs, electricity meters, lift controllers over BACnet/IP / Modbus TCP / S7 / EtherNet/IP, and deliver it to the BMS, the energy management system, the operations / command centre as OPC UA / BACnet/IP / MQTT. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • air handling units (AHU)
  • chillers
  • lighting control panels
  • PLCs
  • electricity meters
  • lift controllers

Protocol path

BACnet/IP / Modbus TCP / S7 / EtherNet/IP → OPC UA / BACnet/IP / MQTT

Implementation checklist for the project manager

  • Do not modify validated PLC programs; read existing data areas or add gateway-side mapping instead.
  • Freeze the point list and protocol mapping with the client before ordering hardware.
  • Fix a site / asset naming convention before the first site so data from all sites can be compared.
  • Keep OT networks segregated and use VPN for remote access instead of opening ports to the internet.
  • Agree KPI definitions (for example OEE components or kWh per unit) with operations before building dashboards.
  • Roll out in phases: pilot one site or area, confirm data quality, then replicate.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

สถาปัตยกรรมระบบ

Field layer: air handling units (AHU), chillers, lighting control panels, PLCs, electricity meters, lift controllers, connected over BACnet/IP / Modbus TCP / S7 / EtherNet/IP. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: the BMS, the energy management system, the operations / command centre, which receives the data as OPC UA / BACnet/IP / MQTT. Remote access for maintenance runs over VPN rather than open internet ports.

องค์ประกอบของระบบ

Field devices
air handling units (AHU), chillers, lighting control panels, PLCs, electricity meters, lift controllers
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
the BMS, the energy management system, the operations / command centre (OPC UA / BACnet/IP / MQTT)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

ความสามารถด้านซอฟต์แวร์และ AI

  • Consumption baseline and deviation alertsอยู่ในแผน
  • Alarm noise reduction and root-cause groupingอยู่ในแผน

ขั้นตอนการส่งมอบ

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

คุณค่าสำหรับลูกค้า

  • One view of all subsystems instead of separate vendor consoles
  • Consumption visible by area, system and time period
  • Monitoring added without changing existing control programs
  • Open interfaces (BACnet, Modbus, OPC UA, MQTT, HTTP) avoid lock-in to one vendor