المشكلة

Electricity, water, gas and BTU meters are read by hand or not at all, so energy reports are late, incomplete and impossible to trace back to a system or floor.

نظرة عامة على الحل

MILESGO gateways collect data from electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters over Modbus RTU / M-Bus / DL/T 645, and deliver it to the energy management system, the BMS, a cloud platform (MQTT) as BACnet/IP / MQTT / Modbus TCP. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • electricity meters
  • water meters
  • gas meters
  • BTU / heat meters
  • M-Bus meters

Protocol path

Modbus RTU / M-Bus / DL/T 645 → BACnet/IP / MQTT / Modbus TCP

Implementation checklist for the project manager

  • Record CT ratios, meter IDs and multipliers in the point table; wrong multipliers are the usual cause of billing errors.
  • M-Bus: check unit loads and cable length per segment; 2-wire M-Bus gateways need a 24 V DC supply.
  • Configure NTP so trends, alarms and meter readings carry consistent timestamps.
  • Confirm local storage so data survives network outages, and define the retention period.
  • Fix a site / asset naming convention before the first site so data from all sites can be compared.
  • Hand over configuration backups, point table, IP plan and as-built drawings, with a short operator training.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

بنية النظام

Field layer: electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters, connected over Modbus RTU / M-Bus / DL/T 645. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: the energy management system, the BMS, a cloud platform (MQTT), which receives the data as BACnet/IP / MQTT / Modbus TCP. Remote access for maintenance runs over VPN rather than open internet ports.

مكونات النظام

Field devices
electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
the energy management system, the BMS, a cloud platform (MQTT) (BACnet/IP / MQTT / Modbus TCP)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

قدرات البرمجيات والذكاء الاصطناعي

  • Consumption baseline and deviation alertsتجريبي
  • Automatic report drafting from collected dataضمن الخطة

خطوات التسليم

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

القيمة للعميل

  • Manual readings replaced by scheduled automatic collection
  • Consumption visible by area, system and time period
  • Consumption attributable by tenant, department or cost centre
  • Timestamped records for compliance and reporting

المزيد من الحلول في Smart Building

أخبرنا عن مشروعك

أرسل البروتوكولات وعدد النقاط والنظام المستهدف. يراجع فريق من المبيعات والهندسة كل طلب.

ناقش مشروعك