MILESGO
Minta Penawaran

Energy & PowerS12

Multi-Utility Metering

Masalahnya

Water, electricity, gas and heating/cooling meters use different protocols and are managed by different teams, so there is no single consumption record per building or tenant.

Ikhtisar solusi

MILESGO gateways collect data from electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters over M-Bus / Modbus RTU / DL/T 645, and deliver it to the energy management system, the billing system, the BMS as Modbus TCP / BACnet/IP / MQTT. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • electricity meters
  • water meters
  • gas meters
  • BTU / heat meters
  • M-Bus meters

Protocol path

M-Bus / Modbus RTU / DL/T 645 → Modbus TCP / BACnet/IP / MQTT

Implementation checklist for the project manager

  • M-Bus: check unit loads and cable length per segment; 2-wire M-Bus gateways need a 24 V DC supply.
  • Record CT ratios, meter IDs and multipliers in the point table; wrong multipliers are the usual cause of billing errors.
  • Fix a site / asset naming convention before the first site so data from all sites can be compared.
  • Configure NTP so trends, alarms and meter readings carry consistent timestamps.
  • Agree data retention and the report format needed for audits with the quality team at the start.
  • Hand over configuration backups, point table, IP plan and as-built drawings, with a short operator training.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

Arsitektur sistem

Field layer: electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters, connected over M-Bus / Modbus RTU / DL/T 645. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: the energy management system, the billing system, the BMS, which receives the data as Modbus TCP / BACnet/IP / MQTT. Remote access for maintenance runs over VPN rather than open internet ports.

Komposisi sistem

Field devices
electricity meters, water meters, gas meters, BTU / heat meters, M-Bus meters
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
the energy management system, the billing system, the BMS (Modbus TCP / BACnet/IP / MQTT)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

Kemampuan perangkat lunak dan AI

  • Consumption baseline and deviation alertsUji coba
  • Automatic report drafting from collected dataDalam rencana

Langkah pelaksanaan

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

Nilai bagi pelanggan

  • Manual readings replaced by scheduled automatic collection
  • Consumption attributable by tenant, department or cost centre
  • Timestamped records for compliance and reporting
  • Consumption visible by area, system and time period

Solusi lain di Energy & Power

Ceritakan proyek Anda

Kirimkan protokol, jumlah titik, dan sistem target. Tim penjualan dan teknik meninjau setiap pengajuan.

Diskusikan Proyek Anda