Metro Station BMS Integration

Masalahnya

Station ventilation, lighting, lifts, escalators and pumps come from different packages, and the station control room has no single view during peak hours or incidents.

Ikhtisar solusi

MILESGO gateways collect data from air handling units (AHU), lighting control panels, lift controllers, escalator controllers, pump controllers and starters, fire alarm panels (read-only) over Modbus TCP / Modbus RTU / BACnet/IP / S7, and deliver it to the BMS, SCADA, the operations / command centre as BACnet/IP / OPC UA / IEC 60870-5-104. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • air handling units (AHU)
  • lighting control panels
  • lift controllers
  • escalator controllers
  • pump controllers and starters
  • fire alarm panels (read-only)

Protocol path

Modbus TCP / Modbus RTU / BACnet/IP / S7 → BACnet/IP / OPC UA / IEC 60870-5-104

Implementation checklist for the project manager

  • Fire and life-safety systems are monitored read-only; control stays with the certified fire system.
  • Freeze the point list and protocol mapping with the client before ordering hardware.
  • Agree BACnet device instances, network numbers and BBMD with the BMS contractor to avoid conflicts.
  • Keep OT networks segregated and use VPN for remote access instead of opening ports to the internet.
  • Build and simulate the configuration off site (FAT) before installation to shorten time on site.
  • Define an alarm matrix (priority, recipient, escalation) and test every alarm end to end at SAT.
  • Hand over configuration backups, point table, IP plan and as-built drawings, with a short operator training.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

Arsitektur sistem

Field layer: air handling units (AHU), lighting control panels, lift controllers, escalator controllers, pump controllers and starters, fire alarm panels (read-only), connected over Modbus TCP / Modbus RTU / BACnet/IP / S7. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: the BMS, SCADA, the operations / command centre, which receives the data as BACnet/IP / OPC UA / IEC 60870-5-104. Remote access for maintenance runs over VPN rather than open internet ports.

Komposisi sistem

Field devices
air handling units (AHU), lighting control panels, lift controllers, escalator controllers, pump controllers and starters, fire alarm panels (read-only)
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
the BMS, SCADA, the operations / command centre (BACnet/IP / OPC UA / IEC 60870-5-104)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

Kemampuan perangkat lunak dan AI

  • Alarm noise reduction and root-cause groupingDalam rencana
  • Predictive maintenance indicators from equipment trendsDalam rencana

Langkah pelaksanaan

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

Nilai bagi pelanggan

  • One view of all subsystems instead of separate vendor consoles
  • Alarms reach the right person by SMS, email or messaging apps
  • New equipment integrated by configuration, not custom driver development
  • Timestamped records for compliance and reporting