MILESGO
اطلب عرض سعر

Water & EnvironmentalS44

Smart Water Metering

المشكلة

Water meters in basements and shafts are read by hand or estimated, causing billing disputes and hiding leaks until the bill arrives.

نظرة عامة على الحل

MILESGO gateways collect data from water meters, M-Bus meters, LoRaWAN wireless sensors over M-Bus / LoRaWAN / Modbus RTU, and deliver it to the billing system, a cloud platform (MQTT), the energy management system as MQTT / Modbus TCP / BACnet/IP. Field equipment keeps its own protocol and control logic; integration is done by configuration and point mapping, not custom code.

Typical scope

  • water meters
  • M-Bus meters
  • LoRaWAN wireless sensors

Protocol path

M-Bus / LoRaWAN / Modbus RTU → MQTT / Modbus TCP / BACnet/IP

Implementation checklist for the project manager

  • M-Bus: check unit loads and cable length per segment; 2-wire M-Bus gateways need a 24 V DC supply.
  • Run a LoRaWAN coverage survey and pick the regional band (EU868 / US915 / AU915 / AS923 / KR920 / CN470) before ordering.
  • Record CT ratios, meter IDs and multipliers in the point table; wrong multipliers are the usual cause of billing errors.
  • Configure NTP so trends, alarms and meter readings carry consistent timestamps.
  • Fix a site / asset naming convention before the first site so data from all sites can be compared.
  • Roll out in phases: pilot one site or area, confirm data quality, then replicate.

Project deliverables

  • Signed point table and protocol mapping
  • Gateway configuration files and backups
  • IP address plan and network drawing
  • FAT and SAT test records
  • As-built documentation and operator training

بنية النظام

Field layer: water meters, M-Bus meters, LoRaWAN wireless sensors, connected over M-Bus / LoRaWAN / Modbus RTU. Edge and integration layer: MILESGO protocol gateways and edge controllers, mounted on DIN rail in existing panels, polling each device, time-stamping values and buffering them locally. Upper layer: the billing system, a cloud platform (MQTT), the energy management system, which receives the data as MQTT / Modbus TCP / BACnet/IP. Remote access for maintenance runs over VPN rather than open internet ports.

مكونات النظام

Field devices
water meters, M-Bus meters, LoRaWAN wireless sensors
Edge / integration
MILESGO protocol gateways and edge controllers
Upper systems
the billing system, a cloud platform (MQTT), the energy management system (MQTT / Modbus TCP / BACnet/IP)
Tools and commissioning
Web-based configuration, point table import/export (Excel), off-site simulation and on-site diagnostic tools

قدرات البرمجيات والذكاء الاصطناعي

  • Consumption baseline and deviation alertsتجريبي
  • Anomaly detection on trend dataضمن الخطة

خطوات التسليم

  1. 1

    Site survey and point list

    Inventory devices, protocols, register maps, panel space, power and network paths.

  2. 2

    Design and point table sign-off

    Map every point to the target protocol and system; agree it with the client and the upper-system contractor.

  3. 3

    Configuration and FAT

    Build the gateway configuration off site, simulate it and test against the signed point table.

  4. 4

    Installation and wiring

    Mount gateways on DIN rail, wire RS-485 / I/O / Ethernet, apply the IP plan.

  5. 5

    SAT and alarm tests

    Verify values against local readings, test every alarm and command end to end.

  6. 6

    Handover and support

    Hand over configuration backups, point table and as-built documents; train operators.

القيمة للعميل

  • Manual readings replaced by scheduled automatic collection
  • Consumption attributable by tenant, department or cost centre
  • Abnormal conditions seen early, before they become failures
  • Timestamped records for compliance and reporting

المزيد من الحلول في Water & Environmental

أخبرنا عن مشروعك

أرسل البروتوكولات وعدد النقاط والنظام المستهدف. يراجع فريق من المبيعات والهندسة كل طلب.

ناقش مشروعك